• BGS Metadata Catalogue
  •   Search
  •   Map
  •  Sign in

DECC: Reports from Longannet ScottishPower UK Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) Project

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what exactly would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS demonstration project at Longannet Power station in Scotland (Goldeneye) through to construction. The study has yielded invaluable knowledge in areas such as cost, design, end-to-end CCS chain operation, health and safety, environment, consent and permitting, risk management, and lessons learnt. The ScottishPower CCS Consortium FEED study material are available for download.

Simple

Date (Publication)
2011-04
Citation identifier
http://data.bgs.ac.uk/id/dataHolding/13606624
Point of contact
Organisation name Individual name Electronic mail address Role

Department of Energy & Climate Change (DECC)

Department of Energy & Climate Change (DECC)

not available

Owner

ScottishPower

ScottishPower

not available

Originator

Scottish CCS Consortium

Scottish CCS Consortium

not available

Originator

ScottishPower CCS Consortium

ScottishPower CCS Consortium

not available

Principal investigator

British Geological Survey

Enquiries

enquiries@bgs.ac.uk

Distributor

British Geological Survey

Enquiries

enquiries@bgs.ac.uk

Point of contact
Maintenance and update frequency
notApplicable

GEMET - INSPIRE themes, version 1.0

  • Geology

BGS Thesaurus of Geosciences

  • Carbon capture and storage

  • NGDC Deposited Data

  • UKCCS

dataCentre
  • NGDC Deposited Data
  • UKCCS
Keywords
  • NERC_DDC

Access constraints
Other restrictions
Other constraints
intellectualPropertyRights
Other constraints
Either : (i) the dataset has not been formally approved by BGS for access and use by external clients under license; and / or (ii) the dataset contains 3rd party data or information obtained by BGS under terms and conditions that must be consulted before the dataset can be provided to, or accessed by, BGS staff or external clients. Refer to the BGS staff member responsible for the creation of the dataset if further advice is required. He / she should be familiar with the composition of the dataset, particularly with regard to 3rd party IPR contained in it, and any resultant access restrictions. This staff member should revert to the IPR Section (IPR@bgs.ac.uk) for advice, should the position not be clear.
Use constraints
Other restrictions
Other constraints

The copyright of materials derived from the British Geological Survey's work is vested in the Natural Environment Research Council [NERC]. No part of this work may be reproduced or transmitted in any form or by any means, or stored in a retrieval system of any nature, without the prior permission of the copyright holder, via the BGS Intellectual Property Rights Manager. Use by customers of information provided by the BGS, is at the customer's own risk. In view of the disparate sources of information at BGS's disposal, including such material donated to BGS, that BGS accepts in good faith as being accurate, the Natural Environment Research Council (NERC) gives no warranty, expressed or implied, as to the quality or accuracy of the information supplied, or to the information's suitability for any use. NERC/BGS accepts no liability whatever in respect of loss, damage, injury or other occurence however caused.

Other constraints

Either: (i) the dataset is made freely available, e.g. via the Internet, for a restricted category of use (e.g. educational use only); or (ii) the dataset has not been formally approved by BGS for access and use by external clients under licence, but its use may be permitted under alternative formal arrangements; or (iii) the dataset contains 3rd party data or information obtained by BGS under terms and conditions that must be consulted in order to determine the permitted usage of the dataset. Refer to the BGS staff member responsible for the creation of the dataset if further advice is required. He / she should be familiar with the composition of the dataset, particularly with regard to 3rd party IPR contained in it, and any resultant use restrictions. This staff member should revert to the IPR Section ( ipr@bgs.ac.uk) for advice, should the position not be clear.

Language
English
Topic category
  • Geoscientific information
Begin date
2010-03
End date
2011-04
Supplemental Information

http://webarchive.nationalarchives.gov.uk/20121217150421/http:/decc.gov.uk/en/content/cms/emissions/ccs/ukccscomm_prog/feed/feed.aspx

Reference System Information

No information provided.
Distribution format
Name Version

PDF

Distributor contact
Organisation name Individual name Electronic mail address Role

British Geological Survey

Enquiries

enquiries@bgs.ac.uk

Distributor
OnLine resource
Protocol Linkage Name
https://www.bgs.ac.uk/ukccs/accessions/projects.html
Hierarchy level
Non geographic dataset
Other

non geographic dataset

Conformance result

Title

INSPIRE Implementing rules laying down technical arrangements for the interoperability and harmonisation of Geology

Date (Publication)
2011
Explanation

See the referenced specification

Pass
No

Conformance result

Title

Commission Regulation (EU) No 1089/2010 of 23 November 2010 implementing Directive 2007/2/EC of the European Parliament and of the Council as regards interoperability of spatial data sets and services

Date (Publication)
2010-12-08
Explanation

See http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2010:323:0011:0102:EN:PDF

Pass
No
Statement

ScottishPower began developing the Longannet Carbon Capture and Storage project in 2007 in response to the UK Government’s competition to demonstrate full-scale CCS on power generation in the UK. In the summer of 2009, the ScottishPower CCS Consortium, comprising ScottishPower, National Grid and Shell was formed to further develop this project, which could be one of the world’s first full-scale CCS demonstration plants. In March 2010, the Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what exactly would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS project through to construction. At the heart of that year long study was a commitment by both the Government and the Consortium to undertake one of the most extensive knowledge transfer programmes ever undertaken on CCS. On the 19 October 2011, the UK Government announced that negotiations with the ScottishPower CCS Consortium have concluded. The decision has been taken not to proceed with the first CCS demonstration project at Longannet Power station in Scotland. Despite all parties working extremely hard on the project at Longannet, a satisfactory deal for the UK’s first CCS demonstration project could not be met on this particular project at this particular time. The study has yielded invaluable knowledge in areas such as cost, design, end-to-end CCS chain operation, health and safety, environment, consent and permitting, risk management, and lessons learnt.

Metadata

File identifier
1503649d-6fdd-163a-e054-002128a47908 XML
Metadata language
English
Hierarchy level
Non geographic dataset
Hierarchy level name

non geographic dataset

Date stamp
2025-05-07
Metadata standard name
UK GEMINI
Metadata standard version

2.3

Metadata author
Organisation name Individual name Electronic mail address Role

British Geological Survey

enquiries@bgs.ac.uk

Point of contact
Dataset URI

http://data.bgs.ac.uk/id/dataHolding/13606624

 
 

Overviews

overview

Keywords

NGDC Deposited Data UKCCS


Provided by

logo

Share on social sites

Access to the catalogue
Read here the full details and access to the data.




  •   About
  •   Github
  •